The double loop loading track at the Signal Peak Mine in Montana

Posted: Thu Mar 18, 2021 7:42 pm
by Chris Webster
Here's an interesting picture of a BNSF unit train being loaded on the double loop track at the Signal Peak Mine in Roundup, Montana: Railpictures #765691

And here is a Google Maps Aerial View of the track.

Re: The double loop loading track at the Signal Peak Mine in Montana

Posted: Thu Mar 18, 2021 7:46 pm
by robert.
There is a chemical plant in Delaware with a similar setup. I'm not able to find a photo. I believe the plant sits a few miles south of dover.

Re: The double loop loading track at the Signal Peak Mine in Montana

Posted: Thu Mar 18, 2021 8:57 pm
by De Bruin
Single or double track this configuration is common these days, design du'jour, topography permitting, for many decades now. Think Powder River has a few of these, possibly even a three track loader.

Interestingly these loop loading design, specifcally for grain have been killing off local grain elevator businesses on a mass scale, especially in the mid-west, BNSF, UP, KCS, CP, CN et al, some even getting local tax relief to create these large area unload/loading/storage facilities.

A double track example like this is interesting though will be emulated if the volume warrants it.